Recently Chile SUBTEL has new announcement as below .
1.For the 5150 – 5250 MHz band, the maximum allowed output power is increased from
200 mW to 250 mW.
2.The laboratories that perform the tests and prepare the reports (test reports) presented in the certification applications must have at least two international accreditations, in order to ensure quality and objectivity of the measurements. These accreditations must be stamped on one or more sheets of the reports that accompany the documentation presented at the time of requesting the respective certification. ”
3.Test report need show peak power EIRP in test reports not average